Vistage™ SeriesUltra-Thin Flat-Panel DisplaysModels V-50HD and V-63HDI NSTALLATION/OPERATION MANUAL
Table of Contentsx Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYConnecting an Audio Processor or Secondary Display Devic
Vistage™ Series Flat-Panel Display Installation/Operation Manual xi 1List of FiguresPRELIMINARY2-1. V-50HD Front-Panel Controls and Indicators...
List of Figuresxii Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes:
IntroductionVistage™ Series Flat-Panel Display Installation/Operation Manual 1 PRELIMINARY1.1 About This ManualThis Owner’s Manual describes how to in
Introduction2 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYGraphic Conventions: These symbols appear in numerous places
IntroductionVistage™ Series Flat-Panel Display Installation/Operation Manual 3 PRELIMINARY1.3 Description, Features and BenefitsRunco introduces its V
Introduction4 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYKey Features and Benefits The V-50HD/V-63HD offers these key
Controls and FunctionsVistage™ Series Flat-Panel Display Installation/Operation Manual 5 PRELIMINARY2.1 Vistage Series at a GlanceFront-Panel Controls
Controls and Functions6 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY1. REMOTE CONTROL SENSOR Receives the signals from
Controls and FunctionsVistage™ Series Flat-Panel Display Installation/Operation Manual 7 PRELIMINARYThe rear-panel connectors reside behind protective
Controls and Functions8 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY2.3 DHD Controller Rear PanelFigure 2-5 shows the r
Controls and FunctionsVistage™ Series Flat-Panel Display Installation/Operation Manual 9 PRELIMINARY2.4 V-50HD/V-63HD Remote Control Unit Figure 2-6 s
Controls and Functions10 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY1. IR OUTPUT INDICATORLights when a button is pres
Controls and FunctionsVistage™ Series Flat-Panel Display Installation/Operation Manual 11 PRELIMINARY10. HD 1 (4) / HD 2 (5) Press to select a HD (RGB
Controls and Functions12 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes:
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 13 PRELIMINARY3.1 Remote ControlTo install batteries in the remote contro
Installation14 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes on Remote ControlOperation• Make sure that there is no
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 15 PRELIMINARY3.3 Installation ConsiderationsProper installation of your
Installation16 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYVentilation If you are mounting the V-50HD/V-63HD in an encl
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 17 PRELIMINARY3.4 Connections to the V-50HD/V-63HD and DHD ControllerProc
Vistage™ Series Flat-Panel Display Installation/Operation Manual iii PRELIMINARYRuncoCare™ Standard Two Year Limited WarrantyCongratulations on your p
Installation18 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYConnecting SourceComponents to the DHDControllerConnect your
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 19 PRELIMINARYComponent Video Source Connections: Connect your component
Installation20 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYRGBHV Source Connections: Connect personal computers and/or
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 21 PRELIMINARYSCART RGBS Source Connections: Connect the green, blue and
Installation22 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYConnecting an AudioProcessor or SecondaryDisplay Device to t
InstallationVistage™ Series Flat-Panel Display Installation/Operation Manual 23 PRELIMINARYRS-232 Controller ConnectionUse a straight-through, 9-pin R
Installation24 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYConnecting to AC Power The V-50HD/V-63HD ships with two (2),
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 25 PRELIMINARY4.1 Setting the Computer Display PropertiesTo maximize image q
Operation26 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY5. Click the Advanced button and click the Monitor tab on the d
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 27 PRELIMINARY4.2 Using the On-Screen MenusTo display the Main Menu, press t
iv Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYIn the event of a product defect, please follow the warranty claim proce
Operation28 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYFigure 4-1. V-50HD/V-63HD OSD Menu Structure (continued)Service
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 29 PRELIMINARYMain MenuThe Main Menu is the starting point for accessing all
Operation30 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYTable 4-1. Aspect Ratio SettingsAspect RatioRemote ControlKeyDe
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 31 PRELIMINARYCinema CINEMA Select Cinema to view 2.35:1 source material on
Operation32 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYScreen The Screen Menu allows you to recall multiple sets of st
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 33 PRELIMINARYPLUGE patterns vary but generally consist of some combination
Operation34 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYColor Saturation: On your external test pattern source, select
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 35 PRELIMINARY11.Adjust the color saturation level until the outermost (gray
Operation36 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYSharpness: “Sharpness” is the amount of high-frequency detail i
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 37 PRELIMINARYHeight: Select Height from the Input Position menu to change t
Vistage™ Series Flat-Panel Display Installation/Operation Manual v PRELIMINARYh Expected lamp degradation and normal decrease in lamp output over a pe
Operation38 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYPhase (RGB, Component or SCART sources): This control adjusts t
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 39 PRELIMINARYYou should save changes to any of the following settings to a
Operation40 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYInformation Signal / System: Select Information from the Main M
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 41 PRELIMINARYCalibrationUse the Calibration menu to perform advanced pictur
Operation42 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY• Color Temp: Select Color Temp from the Display Color - Common
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 43 PRELIMINARYDisplay Color - Panel Settings: These settings are also saved
Operation44 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYSave ISF Night/Save ISF Day: Whenever you make a change to the
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 45 PRELIMINARY•Aspect Ratio - Paste Settings: To apply the Output Shift and
Operation46 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYTo correct keystoning or pincushion distortion:1. On the DHD Co
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 47 PRELIMINARY• Splash Timer: When you turn on the V-50HD/V-63HD, it project
vi Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYPlease visit http://www.runco.com/support/product-registration/ to regis
Operation48 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYPress MENU to exit test pattern mode. Input Names: You can give
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 49 PRELIMINARY• DHCP: To enable the DHCP client in the DHD Controller, selec
Operation50 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY• E-Mail Notification: Select E-Mail Notification from the Netw
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 51 PRELIMINARY• Periodic Service Notification: You can have the DHD Controll
Operation52 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYColor Space: Select Color Space from the Service menu to choose
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 53 PRELIMINARY•CUE (Chroma Upsampling Error) Correction: Some DVD players us
Operation54 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYSync Threshold: Select Sync Threshold to adjust the threshold a
OperationVistage™ Series Flat-Panel Display Installation/Operation Manual 55 PRELIMINARYFront Panel Brightness: Select Front Panel Brightness from the
Operation56 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes:
Maintenance and TroubleshootingVistage™ Series Flat-Panel Display Installation/Operation Manual 57 PRELIMINARY5.1 Troubleshooting TipsTable 5-1 provid
Vistage™ Series Flat-Panel Display Installation/Operation Manual vii PRELIMINARYThank you for your purchase of this quality Runco video product! For t
Maintenance and Troubleshooting58 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYThe display is jittery or unstable.• Poor
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 59 PRELIMINARYIn addition to using the DHD Controller remote control
External Control60 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYTable 6-1 lists the RS-232 command set. The “Parameter (
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 61 PRELIMINARYAspect Ratio Commands16:9 NA YES Selects the 16:9 aspec
External Control62 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYImage Preset CommandsCUSTOM1 NA YES Loads “Custom 1” ima
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 63 PRELIMINARYSleep Timer CommandsSLEEPTMR? NA NA Returns sleep timer
External Control64 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY6.2 Using Discrete IR CodesThe DHD Controller accepts co
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 65 PRELIMINARYFor example, here is the RC5 control code for the ON bu
External Control66 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYIR Command List Table 6-2 lists the RC5 control codes fo
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 67 PRELIMINARYST60MIN 0x3462 0x3C62 Sets the sleep timer to 60 minute
viii Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYThe Product contains small amounts of tin, lead and/or mercury. Dispos
External Control68 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY6.3 Using HDMI CEC MessagesThe DHD Controller accepts an
External ControlVistage™ Series Flat-Panel Display Installation/Operation Manual 69 PRELIMINARYGive Physical Address 0x83– √Set Stream Path 0x86– √Get
External Control70 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes:
SpecificationsVistage™ Series Flat-Panel Display Installation/Operation Manual 71 PRELIMINARY7.1 V-50HD/V-63HD SpecificationsTable 7-1 lists the V-50H
Specifications72 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY7.2 DHD Controller SpecificationsTable 7-2 lists the DHD C
SpecificationsVistage™ Series Flat-Panel Display Installation/Operation Manual 73 PRELIMINARY7.3 V-50HD DimensionsFigure 7-1 shows the V-50HD dimensio
Specifications74 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY7.4 V-63HD Dimensions Figure 7-2 shows the V-63HD dimensio
SpecificationsVistage™ Series Flat-Panel Display Installation/Operation Manual 75 PRELIMINARY7.5 Supported TimingsTable 7-3 lists the signal types sup
Specifications76 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARY1280x1024 1280x102460.00 63.981 108.000 √√√– –75.00 79.976
SpecificationsVistage™ Series Flat-Panel Display Installation/Operation Manual 77 PRELIMINARYPAL-M – 59.94/60.00 15.734/15.750 3.580 – – – – √PAL-N –
Vistage™ Series Flat-Panel Display Installation/Operation Manual ix 1Table of ContentsPRELIMINARYRuncoCare™ Standard Two Year Limited Warranty ...
Specifications78 Vistage™ Series Flat-Panel Display Installation/Operation ManualPRELIMINARYNotes:
Runco International • (800) 23RUNCO • Fax (503) 748-8161 • www.runco.com020-1114-00 Rev. AApril 2011
Comments to this Manuals